Building

Construction work began in the summer of 2001 and was completed in 2003.

The civil works comprise 1800 m2 divided into 6 different parts:

  • laboratory, offices and crush pa.
  • An underground part (12 meters underground) with the vinification hall and the pressing area. and cask-ageing hall.
  • An underground part (12 meters underground) with the cask-ageing hall.
  • A partially-underground part with the bottle-ageing hall and finished product area.
  • The street level is where the bottling area and the finished product warehouse are located.
  • At the top there is a hospitality room, a dining room and terraces with views of Sierra Cantabria and the mountains of Clavijo. The Jubera and Leza rivers can also be admired from here.